一本色道久久综合无码人妻,欧美成人精品 一区二区三区,色偷偷888欧美精品久久久,色天使亚洲综合一区二区

Hello, welcome to visit Jiangsu Haixin shipping Heavy Industry Co., Ltd. website!
Language:中文 English
Wonderful content loading
1 2 34

Trail run of “Xin Zilang3”     DATE: 2020-07-02 09:26:00    The author:本站

Trail run of  the 8000 m3 Trailing Suction Hopper Dredger——“Xin Zilang 3”
 
      On July 2, 2020, the 8000 M3 Trailing Suction Hopper Dredger (“Xinzilang No.3”) (“TSHD”)built for Jiangsu Haihong Construction Engineering Co., Ltd (“HAIHONG”) by Jiangsu Haixin Shipping Heavy Industry Co., Ltd. (“HAIXIN”) sailed for East China Sea for her sea trail and dredging test and has safely returned gac to HAIXIN’s outfitting wharf in the afternoon of July 6 after all relevant tests been successfully completed. The dredger is invested by HAIHONG, designed by MARIC and built by HAIXIN. With the compliance with IMO Tier III of emmision requirement, the dredger is suitable for dredging compaign in coastal port area and channels together with coastal maintenance project under unrestricted service deployment.
       
        During sea trial, various tests e.g. the release and recovery test of Rescue Boat and Llifeboat, loading test of Main Engine, Speed Test, Steering Test, Williamson Test, Shafting Power Test, Noise and Vibration Test etc. were all successfully being carried out with all index approved to reach or even above designed requirement, e.g. the speed under full loaded draft reached 14.8 Knots, which is 10% faster than designed speed and the light draught speed of 17.5 knots. During dredging operation, mud gate dumping test,DPDT dredging test were all successfully completed, among them 50 minutes taken with one underwater pump working,reached 60m depth; 25 minutes taken with two dredge pump working; 65 minutes taken for inboard pump dredging; all above data are far above designed requirement.
        The equipment configured in this THSD also have been upgraded in comparison with previous. In order to satisfy the dredging requirement of multiple terrain, the dredging depth of her starboard hopper arm can reach as deep as 60M and two sets of hopper head hanger are installed on starboard deck, which makes different depth dredging operation simaltenously is feasible, and with the control of DPDT system, high precision dredging mode such as DT dredging mode, DT navigation dredging mode, positioned dredging mode etc are all achievable. The underwater pump (mainly adopted for underwater dredging operation) and inboard pump (mainly adopted for discharging operation) equipped onboard enables the THSD to bring into fully play in dredging ability under clay discarding and excavating condition.
        The successful sea trial and dredging test of “Xinlangzi No.3” sets up a solid foundation for her smoothly delivery. During the following one week, project team will save no efforts to put her into operation in shortest time following rectification of those deficiencies raised during sea trail by means of elaborate organization of all relevant engineers and technicians.
PREVIOUS:【Steel-Cut Ceremony】60m Ferry
NEXT:【Contract Signing Ceremony】 60m Ferry

Copyright 2016-2019 Jiangsu Haixin shipping Heavy Industry Co., Ltd. all rights reserved 蘇ICP備10223514號-1
Hotline:0513-82181366 E_mail:jiangsuhaixin@jshxship.com
Adress:Number 3006 Xianggang Road,Binjiang Street,Haimen City,Jiangsu Province

ONLINE
TOP
精品福利一区二区三区免费视频| 我的公把我弄高潮了视频| 起碰免费公开97在线视频| 亚洲av伊人久久综合密臀性色| 亚欧免费无码aⅴ在线观看| 日韩无码专区| 人妻无码一区二区不卡无码av | 四虎国产精品永久在线观看| 用舌头去添高潮无码视频| 1000部精品久久久久久久久| 精品国产人妻一区二区三区| 性色av免费网站| 亚洲av一二三区成人影片| 欧美黑人欧美精品刺激| 色欲av伊人久久大香线蕉影院 | 精品久久综合1区2区3区激情| 久久人人爽人人爽人人片亞洲| 国产精品欧美福利久久| av狠狠色丁香婷婷综合久久 | 黑人玩弄人妻中文在线| 一本色道无码道dvd在线观看| 亚洲日韩中文字幕在线播放| 狠狠躁日日躁夜夜躁2020| 老司机午夜福利视频| 97在线视频人妻无码| 一本色道久久综合无码人妻| 国产一区二区三区美女| 亚洲另类激情综合偷自拍图| 97人妻人人做人碰人人添| 精品无码成人久久久久久| 精品久久久久久久久久久aⅴ| 天天看片视频免费观看| 色综合色狠狠天天综合色| 国产精品美女久久久久久久久| 中文字幕亚洲综合久久菠萝蜜| 九九久久精品国产| 五月丁香六月狠狠爱综合| 欧美老熟妇乱大交xxxxx| 又粗又硬又黄a级毛片| 欧美老熟妇牲交| 国产男女猛烈无遮挡免费视频网站 |